上海各区喝茶服务

Label: rubber coating

Rubber coating Give you a detailed introduction Rubber coating Product classification of, including Rubber coating The purpose, model, scope, pictures, news and price of all products under. At the same time, we have selected Rubber coating The classified industry information, price quotations, exhibition information, picture materials, etc. have won praise from users nationwide. For more details, please click to visit!

Classification:

  • [ Industry News ] Development of silicone foam board sealing strip industry in China

    Under the new economic normal, rubber and plastic sealing enterprises have accelerated their transformation, constantly looking for new development opportunities in the Internet platform, overseas markets, etc., and achieved certain results, most intuitively reflected in the increase of operating income. According to the 2016-2020 Research Results of China's Silicone Industry released by Linghe. com, the silicone sealing strip has the following characteristics: 1. Good sealing performance of silicone material
    Published on: June 11, 2019 Number of hits: 38

  • [ Industry News ] Silicone foam series ---- silicone foam board

    The performance and advantages of the product are as follows: molded foam board This product has introduced foreign foam technology, and the foam density is uniform, with a density of 0.3-1.0g/cm3. The product is soft, light, good resilience, strong tensile force, high strength, odorless, tasteless and non-toxic. Long service life, high temperature resistance can reach more than 300 ℃ without deformation. Features: 1. UV resistant and ozone resistant
    Published on: June 11, 2019 Number of hits: 46

  • [ Industry News ] Characteristics of PE wharf fender veneer

    Our factory specializes in the production of wharf fenders, wharf anti-collision plates, fender veneers and other special plates for the wharf. The following are the five highlights and application fields of our wharf anti-collision plates. Five advantages of dock anti-collision plate: 1. High molecular weight, light weight, easy to handle and install& n
    Published on: June 11, 2019 Clicks: 55

  • [ Industry News ] Key devices for fender floating installation

    1. After the installation vessel's module is loaded, the floating installation vessel will transport the topside to the designated sea area, and install the topside on the fixed structure or floating structure by adjusting the ballast system. There are many factors that affect the selection of ships for maritime transportation, and the draft limit, width limit, load limit and platform transportation are comprehensively considered
    Published on: June 11, 2019 Number of hits: 104

  • [ Industry News ] The following points must be paid attention to during the entry of fender

    (1) The incoming end must be aligned with the jacket notch; (2) The collision force between the fender and the jacket must be less than the bearing limit of the jacket and the fender itself; (3) There shall be no collision between the installation leg of the topside and the jacket leg during ship entry; (4) The longitudinal and transverse motions and yaw angles of the installation vessel must be controlled within a certain range. When the boat entry operation is completed
    Published on: June 11, 2019 Clicks: 54

  • [ Industry News ] Installation process of fender floating method

    The floating installation method of offshore platform topsides has become an effective installation method since the 1980s. After years of practice and exploration in the industry, not only the weight of the installation structure is increasing, but also the installation method is constantly challenging the worse construction sea conditions. The floating method solves the contradiction that the module construction cannot be expanded due to the limitation of lifting capacity, and improves the efficiency of platform construction
    Published on: June 11, 2019 Number of hits: 59

  • [ Industry News ] Buoyancy Method Technology of Offshore Platform Fender

    The float over method (float over installation method) is an installation technology that uses a barge to carry the topside of the offshore operation platform. During the installation process, the topside is lifted and lowered by means of tide level, barge load adjustment and lifting mechanism. At the same time, special connecting parts are used to complete the butt joint between the topside and the lower jacket platform. During the floating installation of offshore platform module, the module is loaded by tug
    Published on: June 11, 2019 Clicks: 73

  • [ Industry News ] Research on Buoyancy Method for Fender of Large Offshore Platform

    With the exploration and development of offshore oil fields, the offshore oil industry has developed rapidly. The offshore operation platform is developing in the direction of large-scale and intensive, and the overall weight of the offshore platform topside structure also increases. The rapid development of offshore oil and gas field development has put forward higher requirements for the installation technology and operation capability of offshore super large platforms
    Published on: June 11, 2019 Number of hits: 65

Shanghai Jiongjie Rubber and Plastic Industry Co., Ltd   
Online Service
share One click sharing
Welcome to leave us a message
Please enter your message here, and we will contact you as soon as possible.
full name
contacts
Telephone
Landline/mobile number
mailbox
mailbox
address
address